Home / What does the gap between plan and shop floor cost you?
What does the gap between plan and shop floor cost you?
The plan exists. The shop floor decides what actually happens. Put a number on that gap — three steps, two minutes. The calculation uses your machines, your shifts, your hourly rate and your unplanned downtime percentage.
On this page
- Step 1: number of machines, shifts per day and machine utilisation
- Step 2: machine hour rate (labour, overhead, depreciation) and unplanned downtime percentage
- Step 3: annual cost of unplanned downtime, with the full calculation shown
- Formula: available time × downtime percentage × machine hour rate